Engineering office automation:
from drawing to BOM to production.

Three agents that read drawings, prepare BOMs and item codes in your ERP and follow progress on the shop floor, step by step.

Works with PDF, DWG / DXF, STEP, your ERP and shop-floor reports.

Engineering office automation: what the agents do on everyday documents.

1 of 3

Bill of Materials (BOM)

Reads 2D and 3D drawings: PDF, DWG, DXF, STEP. Extracts components, materials and quantities. Builds the BOM with the routings you already have in your ERP.

It writes to you if the BOM is ready for the engineer’s review, before it is loaded.

Agent profile →
Drawing DS610Disc Ø610 · scale 1:5
Ø6106Ø604 holes Ø12at 90°
Material
Boron steel sheet 6 mm
Treatment
Hardening
Finish
Powder coating
BOM agentDiameter, thickness, material, treatment and finish read. BOM ready in 4 minutes, waiting for the engineer’s review.

2 of 3

Item Coding

Looks up every component in the item master. Reuses the existing code when there is one. Creates new codes following your coding logic.

It writes to you if a component looks like a duplicate of an existing code.

Agent profile →
Bill of materials DS610Rev. 0 · 05/02/2026
Item
Disc Ø610
Coding rule
family-thickness-variant
LvlCodeDescriptionQtyItem master
0DS610-06-BDisc Ø610, 6 mm1New code
1MP-BOR-L06Boron steel sheet 6 mm18.4 kgExisting
1CL-TEMPRAHardening routing1Existing
1CL-VERN-POLPowder coating1Existing
Item Coding agentOnly one new code, created with your rule. Material and routings were already in the item master.

3 of 3

Production Progress

Reads shop-floor reports, even handwritten ones. Updates the progress of each step in the ERP. Works out whether the job stays on schedule.

It writes to you if a step is late against the delivery date.

Agent profile →
Assembly shop report11/02/2026 · shift 1
JobStepPiecesNotes
4471cutting1200/1200ok
4471turning1200/1200
4471assembly380/1200M12 screws missing
shop supervisor: G.
Progress agentAssembly at 380 of 1,200 pieces on day three: 2 days late against the 15/02 delivery. Production manager informed.

The Engineering team receives the job opened from the customer order from the Administration team and material arrival dates from the Procurement team. It passes the BOM for supplier orders to the Procurement team and the date the goods are ready to the Logistics team. The coordinator keeps them aligned.