A bill of materials example is the quickest way to understand how a BOM is built: a table with the level, item code, description, quantity and unit of measure of every component needed to make a product. The columns are almost always the same; what changes from one sector to another is the logic. In machinery the multi-level structure matters, in footwear it is size and colour variants, in food it is the recipe per batch and the yield. Below are three complete examples, one per sector, with the typical errors of each.
If you need the definition first, start from our guide on what a bill of materials is. The examples below are built to explain the method: codes and quantities are realistic but not taken from a customer.
The columns every BOM needs
Before the examples, the minimum layout. If one of these columns is missing, sooner or later someone on the shop floor or in purchasing rebuilds it from memory.
| Column | What it is for | Error if missing |
|---|---|---|
| Level | Shows whether a component is direct or inside a sub-assembly | Buying parts made in-house, or the other way round |
| Item code | Links the line to stock, purchasing and costs | Duplicates and stock that never reconciles |
| Description | Tells people what the line is | Ordering similar but wrong material |
| Quantity | Per unit of the parent item | Requirements multiplied or divided by mistake |
| Unit of measure | Pieces, metres, kg, m², litres | Metres in the BOM, bars in the orders |
| Scrap % | Material lost in processing | Material runs out before the batch is done |
| Revision | Ties the BOM to the drawing or recipe in force | Production runs on the old version |
Example 1: machinery, multi-level BOM
Product: a tool trolley with a welded frame, a drawer and castors. It is the typical multi-level BOM: some components are bought, others are made in-house and have a BOM of their own.
| Level | Code | Description | Qty | UoM | Source |
|---|---|---|---|---|---|
| 0 | CR-500 | Tool trolley, complete | 1 | pc | Finished product |
| 1 | ST-500 | Welded, painted frame | 1 | pc | Made in-house |
| 2 | TB-30 | Steel box section 30x30 t. 2 | 8.4 | m | Bought |
| 2 | PN-01 | Folded sheet-metal shelf | 2 | pc | Made in-house |
| 3 | LM-15 | DC01 steel sheet, 1.5 mm | 3.2 | kg | Bought |
| 2 | VN-RAL | Powder coating RAL 3020 | 0.6 | kg | Bought |
| 1 | CS-200 | Drawer with runners | 1 | pc | Bought (subcontracted) |
| 1 | RT-100 | Swivel castor Ø100 | 4 | pc | Bought |
| 1 | VT-M8 | Hex bolt M8x20 | 16 | pc | Bought |
| 1 | IM-CR | Cardboard packaging + corners | 1 | pc | Bought |
How to read it:
- level 0 is the product you sell;
- the frame (ST-500) is a semi-finished item: it is welded and painted in-house, so it has its own BOM at level 2;
- the shelf (PN-01) goes one step further down, to level 3, because it is cut and folded from sheet metal;
- the coating is in kg, not pieces: each frame needs 0.6 kg, including what is lost in the booth.
The typical error in machinery is the revision. Engineering changes the tube thickness on the drawing, the BOM in the ERP stays as it was, and purchasing orders the wrong material. This is the problem our agent that builds the BOM from the drawing deals with: it reads the drawing, matches the item codes and flags when drawing and BOM no longer agree. How the engineering BOM becomes the BOM the shop floor uses, with the same frame in both versions, is explained in our guide to the manufacturing BOM.
Example 2: footwear, BOM with variants and contract manufacturing
Product: a men's leather loafer in dark brown, made for a brand under contract. In footwear one "model" BOM generates dozens of real BOMs, because many consumptions change with size.
| Level | Code | Description | Qty (size 42) | UoM | Varies with |
|---|---|---|---|---|---|
| 0 | MC-210-TM | Men's loafer, dark brown | 1 | pair | Size, colour |
| 1 | TO-210 | Closed upper (semi-finished) | 1 | pair | Size, colour |
| 2 | PL-VTM | Calf leather, dark brown | 2.1 | dm² | Size, colour |
| 2 | FO-PC | Goatskin lining | 1.6 | dm² | Size |
| 2 | FI-40 | Polyester thread no. 40 | 18 | m | — |
| 1 | SU-210 | Leather sole | 1 | pair | Size |
| 1 | SO-210 | Insole | 1 | pair | Size |
| 1 | TA-25 | Leather heel, 25 mm | 1 | pair | Size (group) |
| 1 | AC-MS | Metal bit | 1 | pair | Colour |
| 1 | SC-210 | Box with tissue paper | 1 | pc | — |
Three things make the difference in this sector:
- Leather consumption is in square decimetres and grows with size. It is defined for a base size and scaled with a grading table; without it, the leather calculation is wrong for the whole batch.
- Leather scrap is high and variable, because it depends on the quality of each lot. Manage it as a separate percentage, not hidden inside the consumption.
- In contract manufacturing some materials belong to the client. Leather and branded trims often come from the client: the BOM must say who supplies what, or you buy material you should not, or use the wrong client's stock.
The typical error is the variant: an order arrives by size and colour, and someone works out requirements by hand from the model BOM. We cover this on the page about AI agents for footwear and fashion contract manufacturers.
Example 3: food, BOM as a recipe per batch
Product: butter shortbread biscuits, 350 g pack. In food the BOM is often called a recipe, and it works per dough batch, not per piece. Example for a 100 kg batch.
| Level | Code | Description | Qty | UoM | Notes |
|---|---|---|---|---|---|
| 0 | BF-350 | Butter shortbread, 350 g pack | 260 | pack | Expected yield from the batch |
| 1 | IM-FR | Shortbread dough (semi-finished) | 100 | kg | Standard batch |
| 2 | FA-00 | Wheat flour type 00 | 52 | kg | Allergen: gluten |
| 2 | BU-82 | Butter 82% fat | 22 | kg | Allergen: milk |
| 2 | ZU-01 | Caster sugar | 18 | kg | — |
| 2 | UO-PA | Pasteurised egg | 7.5 | kg | Allergen: egg |
| 2 | AR-VA | Natural vanilla flavouring | 0.3 | kg | — |
| 2 | SA-01 | Salt | 0.2 | kg | — |
| 1 | BU-350 | Printed flow-pack film | 260 | pc | — |
| 1 | CT-12 | Case of 12 packs | 22 | pc | — |
The yield calculation, as an example: 100 kg of dough loses water in the oven and some forming scrap. If the finished product weighs about 91 kg, it fills 260 packs of 350 g. That yield (here about 91%) is the most important number in the recipe: if it is wrong, costs, packaging requirements and production plans are all wrong.
What changes compared with the other sectors:
- allergens live in the BOM, because labels and checks come from there;
- traceability is by lot: each product lot must trace back to the lots of flour, butter and egg used;
- packaging is calculated on the yield, not on the dough.
The typical error is a recipe updated in the lab and not in the ERP: the butter supplier or the sugar percentage changes and the BOM stays as it was. For those who supply retail chains, the problem adds to orders arriving in different formats; see our page on food manufacturing.
The three examples side by side
| Machinery | Footwear | Food | |
|---|---|---|---|
| Reference unit | Piece | Pair, by size | Dough batch |
| Structure | Deep multi-level | Model + variants | Recipe + packaging |
| Critical number | Drawing revision | Leather consumption by size | Batch yield |
| Most frequent error | BOM out of line with the drawing | Variant requirements worked out by hand | Recipe changed only in the lab |
| Extra data to manage | In-house semi-finished items | Client-owned materials | Allergens and lots |
From an example to a real BOM
The examples show the shape. The real work is keeping it up to date: entering dozens of lines from the drawing or the spec sheet, matching the right codes, remembering every revision. That is where engineering loses hours and where the errors that surface on the shop floor are born.
It is also the work we hand to our AI agents: the BOM Agent reads drawings and spec sheets, prepares the BOM directly in the ERP and flags new or doubtful codes; people check the exceptions. From there the BOM goes to purchasing and production without being retyped.
Frequently asked questions
How do you write a bill of materials example?
With a table that, for each component, gives the level, item code, description, quantity per unit of the parent item and unit of measure. Add scrap and revision where needed.
What is a multi-level bill of materials, with an example?
A BOM in which some components are themselves made from other components. In the trolley example, the welded frame is a semi-finished item with its own BOM, and the sheet-metal shelf sits one level further down.
How are sizes and colours handled in a footwear BOM?
You define the model BOM on a base size and apply grading tables to the consumptions that change with size; colours and trims become variants.
In food manufacturing, is a recipe a bill of materials?
Yes. It is a BOM per batch, and it must include yield, allergens and traceability of raw material lots.
Want to see the BOM Agent on one of your drawings or spec sheets? Book a demo.